“The definition of scalability is the
ability of a system, network, or process (in this case a project), to handle a
growing amount of work in a capable manner, or its ability to be enlarged to
accommodate that growth. Also known as the timing and process scheduling of a
project”. (Wikipedia 2012)
This
comes under planning however as the vast majority of the planning stage ends
after the initiations and group meetings, it should be made certain that the
scalability remains maintained, adhered to and altered if necessary throughout
the length of the project until the end result.
The
scalability should be measured by taking “risk analysis” of all possible
outcomes, and have procedures and protocols in place that everyone in the group
is aware of. Again this also falls under problem solving section later in this
report.
Some
of the reasons that projects fall behind schedule, include,
over
supervising and under supervising staff and doing jobs that can be automated in
this day and age with a computer. (Viera 2005) Although a good manager should
be able to balance this well, and create a fair and optimised timetable of work.
Managers should also liaise with the client in creating all timescales as this will
determine how many hours are needed to be paid for in a financial since. (I.e.
an estimate of final costs) The client will also have deadlines to meet of their
own, so this is highly important to set right.
An
example of a time management and scalability plan could be to make some form of
graphs, possibly a Gantt chart, this creates an overall understanding of when
all deadlines are, and will greatly increase the team “gelling” to motivate one
another through the tasks. However if the schedules are created for each
individual it means they can also be more self sufficient (i.e. if a team
member is absent or if the manager is not present, work and managerial tasks
have already been set so it is not a disaster.)Teamwork is essential but individual
self reliance the key to modular success. (Pinto 1986)
Overall
estimation of the project requires a process of organising and acquiring data,
this may in a very large project be done by independent engineers or
subcontractors, in some cases a “Professional Estimator” may be hired. He/She
is not involved in the project itself but instead simply looks at all factors
related to costs and time. (Field 2007)